SUNENERGYXT · WONDERVOLT

Your storage system

  • Add storage to your existing solar system AC-coupled storage. Direct solar inputs are not enabled in the base version.
  • Add capacity when you need itExpandable with optional B500 batteries.
  • Keep an eye on your energy flowsMonitor your system in the SunEnergyXT app.

Loading configurations…

Your configuration

—

Tax included.Shipping calculated at checkout.
VAT information for Germany
0% VAT when the legal requirements are met

If the legal requirements are met, a VAT rate of 0% may apply to your photovoltaic installation and essential components.

Legal requirements: Section 12(3) UStG ↗

Manufacturer warranty

Manufacturer's original terms and product information in German.

1 × SunEnergyXT 500 PRO AC Core

GARAN: SunEnergyXT 500 PRO AC Core

10 Jahre Haltbarkeitsgarantie des Herstellers SunEnergyXT Holdings S.à r.l., zusätzlich zu Ihren gesetzlichen Gewährleistungsrechten. Mit Kapazitätszusage: mindestens 70 % der Nennenergie bis zu einem Energiedurchsatz des 8.000-Fachen der Nennenergie je Batterieeinheit (entspricht 10.000 Ladezyklen bei 80 % Entladetiefe). Garantiebedingungen: www.sunenergyxt.com/garantie

Garantiebedingungen (PDF)

Abweichend hiervon beträgt die Garantiedauer fünf (5) Jahre, wenn das Produkt im Freien in einer Entfernung von weniger als 5 km (Luftlinie) zur Meeresküste aufgestellt ist oder war.

Garantie und Produktinformationen

Herstellerangaben für die oben genannten Geräte. Die Garantie gilt nicht für weitere Bestandteile eines Sets.

Erweiterung der 500-Serie

Erweiterbar ausschließlich mit dem SunEnergyXT B500, kompatibel mit 500, 500 PRO und 500 PRO AC Core; höchstens 5 Erweiterungsspeicher je Kopfspeicher. Speicher anderer Hersteller werden nicht erkannt.

B500: Erweiterungsspeicher

Der B500 ist ein Erweiterungsspeicher ohne eigenen Wechselrichter, ohne PV-Eingänge und ohne AC-Anschlüsse. Er funktioniert nur zusammen mit einem SunEnergyXT 500, 500 PRO oder 500 PRO AC Core Kopfspeicher.

Energiemessgeräte

Zusätzliche Versorgungsstrategien in der SunEnergyXT App erfordern ein Energiemessgerät aus der Kompatibilitätsliste: www.sunenergyxt.com/komponenten. Andere Messgeräte lassen sich gegebenenfalls über kompatible Smart-Home-Systeme einbinden und die Steuerung erfolgt dann lokal und nicht über die App.

Internetverbindung

Für die Garantie ist keine Internetverbindung erforderlich. Softwareaktualisierungen, Ferndiagnose und App-Funktionen setzen eine Internetverbindung voraus.

Winterbetrieb und Temperatur

Integrierte Heizfunktion: Bei Zelltemperaturen unter 0 °C werden die Batteriezellen automatisch vorgewärmt. Bis zum Erreichen der Betriebstemperatur stehen Lade- und Entladeleistung nur eingeschränkt zur Verfügung; Dauer und Ausmaß hängen unter anderem von Umgebungstemperatur, PV-Leistung und Zahl der Speicher ab. Oberhalb von 45 °C wird die Leistung reduziert.

Softwareaktualisierungen

Für jedes Gerät werden Softwareaktualisierungen, die zum Erhalt der Sicherheit und der in der Bedienungsanleitung beschriebenen Funktionen erforderlich sind, mindestens für die reguläre Dauer der jeweiligen Herstellergarantie bereitgestellt: fünf Jahre für BK215, BK215 PLUS, B215 und B215 PLUS, zehn Jahre für 500, 500 PRO, 500 PRO AC Core und B500. Für den EV3600 werden Softwareaktualisierungen abweichend von seiner zweijährigen Garantiedauer mindestens fünf Jahre bereitgestellt. Diese Zeiträume gelten auch, wenn sich die Garantiedauer wegen einer Aufstellung in Küstennähe nach Artikel 3.1 der jeweiligen Garantieerklärung verkürzt. Beginn und Nachweis des Zeitraums richten sich nach Artikel 3 der jeweiligen Garantieerklärung; bei Weiterverkauf geht der verbleibende Zeitraum auf den Erwerber über.

Der Hersteller kann die Bereitstellung verlängern; eine Verkürzung des einmal angegebenen Zeitraums erfolgt nicht. Vor Erreichen des Endes werden die Nutzer informiert.

Diese Angabe lässt die gesetzlichen Gewährleistungsrechte des Verbrauchers gegenüber seinem Verkäufer, einschließlich der Aktualisierungspflicht bei Waren mit digitalen Elementen, unberührt.

Der Hersteller stellt für die genannten Produkte Softwareaktualisierungen einschließlich Sicherheitsaktualisierungen bereit. Die Auslieferung erfolgt über die Netzwerkverbindung des Geräts; eine bestehende Netzwerkverbindung ist hierfür Voraussetzung. Beim EV3600 und bei Erweiterungsspeichern erfolgt sie über den Kopfspeicher.

Über Softwareaktualisierungen, die den Funktionsumfang oder die Zusammenarbeit mit gelisteten Komponenten verändern, informiert der Hersteller die Nutzer vorab per E-Mail, in der Regel mindestens einen Monat vor Wirksamwerden. Sicherheitsaktualisierungen, die keinen Aufschub zulassen, können kurzfristig bereitgestellt werden; die Nutzer werden dann spätestens mit der Bereitstellung informiert.

Garantiedauer und Aufstellung in Küstennähe

Die Garantiedauer beträgt für alle in Artikel 1.2 genannten Modelle einheitlich zehn (10) Jahre. Sie beginnt mit dem Kaufdatum (Datum der Rechnung des Erstkaufs). Die Garantie ist an das Produkt gebunden und geht bei einem Weiterverkauf innerhalb der Garantiedauer auf den Erwerber über. Für einen nachträglich erworbenen Erweiterungsspeicher B500 läuft die Garantiedauer gesondert ab dessen Kaufdatum. Abweichend hiervon beträgt die Garantiedauer fünf (5) Jahre, wenn das Produkt im Freien in einer Entfernung von weniger als 5 km (Luftlinie) zur Meeresküste aufgestellt ist oder war. Grund ist die erhöhte Korrosionsbelastung durch salzhaltige Luft.

Im Freien aufgestellt ist ein Produkt, das nicht in einem geschlossenen Raum steht, etwa auf einem Balkon, einer Terrasse, einem Dach oder im Garten. Dass das Produkt in diesem Bereich aufgestellt ist oder war, hat der Garantiegeber nachzuweisen.

Kapazitätszusage und Prüfbedingungen

Ergänzend garantiert der Garantiegeber, dass die nutzbare Speicherkapazität des Produkts während der gesamten Garantiedauer nicht unter 70 % der Nennenergie von 5.024 Wh je Batterieeinheit sinkt. Die Kapazitätszusage gilt, bis der kumulierte Energiedurchsatz der Batterieeinheit das 8.000-fache ihrer Nennenergie erreicht hat; das entspricht 10.000 Ladezyklen bei einer Entladetiefe von 80 %, den Referenzbedingungen der im Datenblatt angegebenen Zyklenlebensdauer. Maßgeblich ist der vom Batteriemanagement erfasste Energiedurchsatz, den der Garantiegeber Ihnen auf Anfrage mitteilt. Bei einem Verbund aus Kopfspeicher und Erweiterungsspeichern gilt die Kapazitätszusage für jede Batterieeinheit gesondert.

Nutzbare Speicherkapazität ist die Energiemenge, die der vollständig geladenen Batterieeinheit über den gesamten vom Batteriemanagement freigegebenen Ladezustandsbereich bis zur Abschaltung durch das Batteriemanagement entnommen werden kann; nutzerseitig eingestellte Ladegrenzen bleiben außer Betracht. Sie wird an den Batterieklemmen (gleichstromseitig) oder anhand der vom Batteriemanagement bilanzierten Entladeenergie ermittelt, bei einer Zelltemperatur von 25 °C ± 2 °C und einer konstanten Entladeleistung von 0,2 C (rund 1.000 W je Batterieeinheit). Die Messung führt der Garantiegeber oder ein von ihm autorisierter Servicebetrieb unentgeltlich durch; Sie erhalten ein Messprotokoll. Der vom Batteriemanagement ausgewiesene Kapazitätswert dient der Vorprüfung und ersetzt die Messung nicht.

Die Kapazitätszusage endet mit dem Ablauf der Garantiedauer oder mit Erreichen des vorgenannten Energiedurchsatzes, je nachdem, welches Ereignis früher eintritt. Die Garantiedauer nach Artikel 3 und die Zusage nach Artikel 2.1 bleiben von der Durchsatzgrenze unberührt.

Geltungsbereich

Diese Garantie gilt für Produkte, die in einem der folgenden Staaten erworben und dort betrieben werden: Deutschland, Belgien, Italien, Luxemburg, Niederlande, Österreich, Portugal, Spanien, Frankreich, Griechenland, Rumänien. Wird ein Produkt in einem dieser Staaten erworben und in einem anderen der genannten Staaten betrieben, bleibt die Garantie bestehen.

Gesetzliche Rechte

Diese Herstellergarantie ist freiwillig. Sie tritt neben Ihre gesetzlichen Rechte bei Mängeln und schränkt diese weder ein noch ersetzt sie diese. Ihnen steht gegenüber dem Verkäufer eine gesetzliche Gewährleistung von mindestens zwei Jahren zu. Die Inanspruchnahme dieser gesetzlichen Rechte ist für Sie unentgeltlich.

Reparatur und Ersatzteile

Reparaturen an den in Artikel 1.2 genannten Produkten werden ausschließlich durch den Hersteller oder durch von ihm ausdrücklich autorisierte Servicebetriebe durchgeführt. Eine Reparatur durch den Verbraucher, durch den Händler oder durch nicht autorisierte Dritte ist nicht vorgesehen.

Ersatzteile werden nicht einzeln an Verbraucher, Händler oder Dritte abgegeben. Für die genannten Produkte besteht kein Ersatzteilvertrieb und dementsprechend keine Ersatzteilpreisliste und kein Bestellverfahren für Ersatzteile.

Die Instandsetzung erfolgt ausschließlich im Rahmen des in Artikel 6 beschriebenen Serviceverfahrens. Dabei werden defekte Baugruppen vom Hersteller getauscht oder das Gerät wird gegen ein instandgesetztes oder gleichwertiges Gerät ausgetauscht.

Reparatur- und Wartungsanleitungen für die genannten Produkte werden Verbrauchern, Händlern und unabhängigen Reparaturbetrieben nicht zur Verfügung gestellt.

Verfügbar sind die Bedienungsanleitung, die Installationsanleitung sowie Hinweise zur Fehlerdiagnose und zur Selbsthilfe bei Störungen. Diese stehen unter www.sunenergyxt.com/download-produktdatenblaetter zum Abruf bereit.

Payment options

  • American Express
  • Apple Pay
  • Google Pay
  • iDEAL Wero
  • Klarna
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • USDC
  • Visa

The options available for your order are shown at checkout.

Your selection

    Total—
    About your selection

    Check the selected product’s scope of delivery before ordering. Installation services are not added by this configurator.

    Product details and scope of delivery

    SunEnergyXT AC CORE

    Keep your solar system. Add storage.

    AC CORE stores energy via the AC connection. An option for adding storage to an existing solar installation without replacing its inverter, subject to the connection requirements.

    5 kWhStorage class
    2,400 WGrid-connected AC output
    ACSystem connection
    SunEnergyXT AC CORE
    Product view. Selected accessories are listed in your configuration above.
    Existing solar panels on a residential roof
    Example of an existing PV installation. Suitable retrofit depends on the installed equipment; this is not an installation plan.

    Everyday use

    Store now, use later

    Solar generation and household demand rarely follow the same schedule. Storage holds energy for the hours when you need it. This example shows what to check over the course of a day.

    1. Morning: check the charge

      Check how much energy remains in the battery. Household consumption is a separate measurement, supplied by a compatible energy meter.

    2. Daytime: store energy

      AC CORE charges through its AC connection. Using PV surplus requires compatible metering and a suitable operating mode.

    3. Evening: use stored energy

      When solar generation falls, the main unit can supply stored energy within its output limits. Charge level and household demand determine how long it lasts.

    4. Night: keep demand and reserve in view

      The battery can continue supplying energy while charge level and operating settings allow it. A retained backup reserve leaves less energy for ordinary use. Neither nominal capacity nor a sunny afternoon guarantees supply until morning.

    Connections and limits

    The existing PV inverter can remain if connection and control requirements are met. AC CORE's direct PV inputs are disabled at the factory. Their use requires a separate paid upgrade, which is not automatically included and is not required for AC-coupled storage.

    Where direct PV is used, module voltage and current must match the main unit's input limits. Total Wp alone does not establish compatibility.

    Follow the exact main unit's connection and installation instructions. Demand above its output limit is not covered by storage alone. B500 adds capacity, not inverter power.

    This sequence explains the principle, not a yield forecast. Weather, panel orientation, loads, conversion losses, battery state and settings affect the result.

    The energy path

    Keep the solar system. Add storage.

    Your existing solar inverter continues converting solar power. AC CORE adds a battery through the AC side, provided the electrical installation and control system are suitable.

    Existing PV installation

    The solar inverter feeds the household's AC network. AC CORE stores energy through that network.

    SunEnergyXT AC CORE

    SunEnergyXT AC CORE

    5,024 Wh nominal energy

    Energy for connected loads

    The inverter converts stored DC energy to AC. Grid-connected output is rated at 2,400 W for this model.

    Simplified explanation of the storage path, not a wiring diagram. It does not show every operating mode or connection. Installation and backup requirements are separate.

    Metering and connection requirements

    Measure demand before controlling output

    A compatible energy meter reports household consumption or grid flow. The main unit can use these measurements for demand-based control. Battery status alone does not show the home's total consumption; meter compatibility and settings matter.

    Direct solar input is a separate option

    AC-coupled storage does not require direct-PV activation. AC CORE's direct PV inputs are disabled at the factory; using them requires a separate paid upgrade. It is not automatically included in this configuration.

    Applications

    Start with your solar installation

    Are you planning new panels or adding storage to an existing PV system? The connection path matters more than whether the panels sit on a balcony or a roof. These examples explain the options; they do not change your selected SunEnergyXT AC CORE.

    Apartment building with solar panels mounted on balconies
    Balcony PV example from DRBO Greenenergy. No identified storage unit is shown; this is not an installation plan or a statement of included items.

    Connect panels directly

    SunEnergyXT 500 and 500 PRO accept compatible solar panels at their active PV inputs. The main unit combines solar charge controllers, battery and inverter. For a new or separate array, this provides a direct route to storage without a separate PV inverter for those panels.

    Have module voltage, current and wiring checked against the main unit's limits. Combined Wp alone does not establish compatibility, and the balcony image does not establish a suitable electrical connection.

    For your selected AC CORE, direct PV inputs are disabled at the factory. Using them requires a separate paid upgrade; the direct-PV example is not its standard configuration.

    Solar panels on the roof of a residential building
    Existing rooftop PV example from DRBO Greenenergy, not an identified SunEnergyXT retrofit. The installed equipment determines the suitable solution.

    Add storage to existing PV

    With AC-coupled storage, the existing PV inverter supplies the household AC network. AC CORE takes in energy through its AC connection. The inverter can remain if the connection and control requirements fit the system; compatibility must be checked for the actual installation.

    A compatible energy meter provides household measurements for consumption-based control. Its model, measurement point, network connection and firmware belong in the planning. AC storage does not require activation of AC CORE's direct PV inputs.

    Consider the loads separately

    A list of appliances is a useful planning tool, not proof that a storage system can supply them all. Record what runs at the same time and which loads you would want during an outage.

    • Heat pump: use electrical input power, not thermal heating output. Starting current, phases, operating mode and auxiliary heaters need a separate compatibility check.
    • EV charging: a compatible wallbox or EVSE, suitable electrical connection and protection are required; load management may also be needed. Storage output is not the wallbox's charging power.
    • Backup: only suitable loads connected to the main unit's backup output are covered by this function, not automatically the whole home. Check load and starting requirements against its limits. B500 has no separate backup output.
    Cutaway illustration of a SunEnergyXT 500-series main unit with battery cells and power electronics
    Series main-unit illustration, not an installation diagram or a B500 cutaway. AC CORE's direct PV inputs require separate activation.

    SunEnergyXT AC CORE · Technology

    Battery

    Lithium iron phosphate battery

    The model-specific datasheet specifies LiFePO4 chemistry and 314 Ah nominal battery capacity. The battery stores energy for later use and is rated for at least 10,000 charge/discharge cycles under the conditions below.

    Conditions for the cycle-life rating

    At least 10,000 cycles at 25 ± 2 °C, 80% depth of discharge, 0.5C charging / 0.5C discharging and 70% remaining capacity at end of life, according to the datasheet. These laboratory conditions do not establish a calendar lifespan or warranty.

    Read the technical datasheet

    SunEnergyXT AC CORE · Solar inputs

    PV activation

    4 × MPPT Factory-disabled
    1. 1PV input
    2. 2PV input
    3. 3PV input
    4. 4PV input
    SunEnergyXT AC CORE
    SunEnergyXT AC CORE
    Simplified input diagram, not a wiring plan. It does not specify port positions or the number of solar panels.

    AC CORE's four direct-PV inputs are disabled at the factory. A separate paid upgrade service is required before use. The hardware values below do not mean that PV operation is included in your selection.

    PV limits and compatibility

    • MPPT operating range: 20–60 V.
    • MPPT power according to the datasheet: 4 × 625 W or 3 × 800 W.
    • Maximum input current: 22 A per input; PV short-circuit current: 25 A per input.

    Module voltage, current and wiring must suit the inputs. Combined module wattage alone does not establish compatibility.

    SunEnergyXT AC CORE · Protection

    Protection and temperature

    Integrated aerosol fire suppression

    The current manufacturer datasheet lists an integrated automatic aerosol fire-extinguishing system for SunEnergyXT AC CORE.

    Continue to follow the placement and safety instructions in the manual. An integrated fire-extinguishing system is not a promise to prevent every fire.

    Cooling and temperature

    The datasheet specifies natural cooling, IP65 protection and an operating range of −20 °C to +55 °C. For this main unit, output is reduced above 45 °C.

    Heating and placement

    Automatic battery heating supports operation at low temperatures; the system controls it without user intervention. Allow for its energy use and choose a sheltered, ventilated location with protected connections.

    Sources

    Source: AC CORE datasheet, file version 260920, p. 2

    The 500 series compared

    Compare the models

    Compare connection type, output and storage capacity.

    Nominal energy and rated output per device. Current model: SunEnergyXT AC CORE

    Swipe sideways to compare all four models

    Feature
    SunEnergyXT 500
    SunEnergyXT 500
    SunEnergyXT 500 PRO
    SunEnergyXT 500 PRO
    SunEnergyXT 500 PRO AC CORE
    SunEnergyXT 500 PRO AC CORE Current model
    SunEnergyXT B500
    SunEnergyXT B500
    Role in the system Main unit with battery, inverter and active direct-PV inputs. Main unit with battery, inverter and active direct-PV inputs. AC-coupled storage for an existing installation, subject to its connection requirements. Additional battery capacity; requires a compatible main unit.
    Nominal energy 5,024 Wh 5,024 Wh 5,024 Wh 5,024 Wh
    Grid output (AC) 800 W 2,400 W 2,400 W No separate AC output
    Backup output (AC) 2,400 W 2,400 W 2,400 W Via the main unit only
    Direct PV connection Four active MPPT inputs Four active MPPT inputs Four inputs, factory-disabled. Separate paid activation required. No PV input

    Nominal energy is not usable energy. Grid and backup ratings must not be added together.

    Sources

    Source: manufacturer technical datasheets for 500 / 500 PRO / B500, pp. 1–3, and AC CORE, p. 1; manual v2.2, PDF p. 7.

    Storage sizing

    More capacity or more power?

    Plan the energy you need over time and the loads running together separately.

    kWhStorage capacity

    Use more energy later

    Compare the energy used after sunset with the surplus available for charging. Choose capacity to match both, not just the number of people in your household.

    kWOutput power

    Check loads running together

    Check the main unit's output against appliances running at the same time. Adding battery capacity does not increase its inverter output.

    Adding B500 batteries increases the capacity of SunEnergyXT AC CORE, not its inverter output. Check the permitted combination and available space before choosing additional batteries.

    View capacity options

    Plan consumption, reserves and usable energy

    Start with two quantities: solar energy left after daytime consumption and energy used when generation falls. Household size alone cannot tell you how much storage is useful.

    Compare surplus and evening use

    Use generation and consumption records from the same periods, including different seasons. Identify how much solar energy remains after immediate household use, then compare it with consumption after sunset. A larger battery cannot make up for missing solar generation.

    Separate power from energy

    Power in kW describes the load at a given moment. Energy in kWh adds up that demand over time. For a constant load, the calculation is:

    1 kW × 1 h = 1 kWh

    A constant 1 kW load uses 1 kWh in one hour. This is an energy calculation, not a battery-runtime promise. Usable energy, conversion losses, charge level, reserve and output limits still matter.

    Choose capacity and check power

    Compare the nominal-energy options in the capacity overview with your consumption records. Do not treat nominal energy as fully usable energy. Any backup reserve leaves less for everyday consumption. Separately, check the main unit's output against appliances running at the same time.

    Capacity expansion

    Expand storage with B500.

    Need more energy for the evening? Add B500 batteries to your main unit as your storage needs grow.

    SunEnergyXT B500
    B500 expansion battery. Included only when selected in your configuration.

    One main unit can be expanded with up to five B500 batteries. Each B500 adds 5,024 Wh of nominal energy, not inverter power. Follow the manual's combination and installation requirements. Your selected quantity is shown in the configuration above.

    Nominal energy per additional B500
    + 5,024 Wh
    Main unit output power
    Unchanged
    Choose storage capacity
    1. Main unit5,024 WhNominal energy
    2. + 1 × B50010,048 WhNominal energy
    3. + 2 × B50015,072 WhNominal energy
    4. + 3 × B50020,096 WhNominal energy
    5. + 4 × B50025,120 WhNominal energy
    6. + 5 × B50030,144 WhNominal energy

    Each illustration shows one main unit plus the stated number of B500 batteries. Quantity comparison only, not an installation plan or an indication of what is included in your order.

    Calculated from 5,024 Wh per main unit and expansion battery. Actual usable energy and runtime depend on operating conditions, reserve settings and conversion losses.

    Expanding with main units

    One, two or three main units.

    B500 adds storage capacity. Additional main units also bring their own inverter.

    15 kWh comparison · not your set contents

    500 PRO and AC CORE: each rated at 2,400 W AC in grid-connected operation.

    All three examples have 15,072 Wh nominal energy, not usable energy.

    1 × SunEnergyXT AC CORE

    + 2 × B50015,072 Wh nominal energy in total

    2,400 W

    1 × 2,400 W · sum of rated device outputs

    One main unit; connection requirements still apply.

    2 × SunEnergyXT AC CORE

    + 1 × B50015,072 Wh nominal energy in total

    4,800 W

    2 × 2,400 W · sum of rated device outputs

    Not automatically usable as a shared 4.8 kW output or a shared backup outlet.

    3 × SunEnergyXT AC CORE

    No additional B50015,072 Wh nominal energy in total

    7,200 W

    3 × 2,400 W · sum of rated device outputs

    Not automatically usable as a shared 7.2 kW output or a shared backup outlet.

    Quantity illustrations, not a wiring diagram or a packing list. No PV input, usable capacity or backup capability is inferred from these power sums.

    Parallel and three-phase control are still announced as forthcoming by the manufacturer. A multi-unit setup needs verification of release, wiring and control requirements. The power sums above are not a promise of a usable shared output.

    Connection requirements and manufacturer status
    Multi-unit control: check the release status

    The manufacturer's 500-series page still lists parallel and three-phase control as forthcoming. The manual already describes a specific off-grid arrangement, but this is not permission for grid-parallel use. The figures shown are sums of individual rated outputs, not a promise of an available or approved combined system output.

    An off-grid cable is not a grid connection

    Manual section 5.5 describes a separately available 3-to-1 off-grid parallel cable. It is exclusively for island operation; the manufacturer prohibits using it for grid-parallel operation. It is not the standard AC connection cable. Check the actual offer to see whether this accessory is included.

    Clarify before ordering

    • Released combination of model, firmware and control system.
    • Electrical connection, phases and protection for the planned installation.
    • Required meter, accessories and services — checked against the actual set contents.

    SunEnergyXT App

    Energy flows at a glance.

    View battery status and energy flows in the SunEnergyXT app and adjust the operating mode to suit the main unit and firmware.

    A PV symbol does not mean AC CORE's direct PV inputs are active. They are disabled at the factory and require a separate paid upgrade.

    Check the battery

    See the charge level and whether energy is being stored or discharged.

    Choose the operating mode

    Available settings depend on the main unit and its firmware.

    Understand household readings

    Household readings require a compatible meter at the appropriate measurement point.

    Go to the app download page iOS and Android · Manufacturer website

    Understand the readings
    PV

    What reaches the solar inputs?

    The PV display concerns the main unit's solar inputs. It is not automatically the output of an existing rooftop inverter. AC CORE needs separate paid activation before its direct PV inputs can be used; B500 has none.

    Battery

    Charge level and power are different

    Charge level describes the battery's state. Charging or discharging power describes the energy flow at that moment. Neither value on its own predicts how long your appliances will run.

    Grid & household

    Check the measurement point

    Grid import, export and household demand are different quantities. A compatible meter and its installation point determine which measurements are available for control. Pair and check the meter using the relevant instructions.

    German SunEnergyXT app example labeled 500 PRO, showing PV, meter, grid, load and battery status
    German-language 500 PRO example screen. All values are illustrative, not live data or a savings forecast. Available functions depend on the model, firmware and connected meter.

    Metering and integration

    Control that fits your system.

    Compatible energy meter

    A compatible meter supplies household measurements for consumption-based control. The app image does not mean a meter is included in your order.

    Meter compatibility

    Manufacturer-listed energy meters

    Shelly 3EM · Shelly Pro 3EM · Shelly EM-50 · EcoTracker IR · EcoTracker P1 · bitShake

    This manufacturer list is a starting point for checking compatibility, not a promise for every installation. Confirm the exact meter, interface, firmware and measurement point. “bitShake” names a product family, not a specific model. A meter is not automatically included.

    Local integration

    Home Assistant integration requires separate setup. Check the supported main unit, firmware and current manufacturer instructions first.

    Cloud, local network and updates

    Cloud app or local network

    According to the manufacturer, full app control uses a cloud connection. An internet connection is recommended for initial setup and is needed for firmware updates. Local control uses the documented mDNS / TCP interface, for example through a separately configured Home Assistant installation; it still requires a working local network and compatible firmware.

    Manufacturer Home Assistant guides

    Setup and interface details

    The manual describes Bluetooth Low Energy-assisted network setup, monitoring and changes to the power-supply mode. The example screen distinguishes PV, meter, grid, load and battery status: these are separate measurement points. Displays vary with connected devices, operating mode and software version.

    Meter model, installation point, network connection and firmware must suit the system design.

    Source: manufacturer product information and FAQ, checked 21 September 2026; local interface according to the user manual. Manufacturer information ↗

    Grid and backup operation

    Backup for connected loads

    Grid-connected output and island-mode output are different operating specifications. A backup socket is not an automatic supply for every circuit in your home.

    Section 6.2 of manual v2.2 describes these three states in UPS mode for suitable loads at the main unit's approved backup connection. PV contributes only through compatible, active direct-PV inputs. AC CORE's inputs are factory-disabled and require separate paid activation.

    01

    Grid available

    The manual describes the connected load being supplied by the battery and available PV generation. If these sources cannot supply enough power, the public grid supplements them.

    02

    Grid outage

    The main unit automatically transfers the backup load to battery and available PV supply. Operation remains subject to the charge level, selected mode and load limits; this does not promise uninterrupted operation for every appliance.

    03

    Grid restored

    When the grid returns, the system automatically switches back to grid operation, according to the manual. This sequence concerns the approved backup load, not an automatic transfer of every household circuit.

    Grid operation

    2,400 W

    This is the rated AC output of SunEnergyXT AC CORE in grid-connected operation, according to its datasheet. It is not an additional allowance on top of backup output.

    Island operation

    2,400 W

    The datasheet specifies this rated island-mode output for suitable connected loads. The manufacturer's model FAQ gives a shared output limit of 2,400 W for grid and backup use: at 800 W grid output, its example leaves 1,600 W for backup.

    Transfer time

    For the main units, the datasheets distinguish UPS mode at ≤10 ms from non-UPS mode at less than 2 seconds. These figures describe transfer timing, not how long the battery can supply a load.

    Check loads and operating conditions

    Check the operating mode and the connected device's tolerance for interruptions. Do not infer suitability for medical, safety-critical or other interruption-sensitive equipment from the switching time alone.

    Load requirements

    • Check continuous demand, starting current and all simultaneously connected loads.
    • Allow for battery charge level, operating temperature, settings and conversion losses when assessing runtime.
    • Only suitable loads connected through the approved backup arrangement can be supplied; house wiring is not automatically backed up.
    • Without PV activation, AC CORE cannot recharge directly from solar modules through its PV inputs.

    The figures are not additive and are not approval for whole-home backup.

    Sources

    Sources: main-unit datasheets, pp. 1–2; manual v2.2, section 6.2 / PDF p. 35; the manufacturer's model FAQ for simultaneous grid and backup use.

    Read the backup instructions

    Before installation

    Prepare the installation

    Device dimensions are only the starting point. The installation also needs a load-bearing surface, room for connections and service, ventilation and weather protection.

    SunEnergyXT AC CORE
    Dimensions of the individual device, L × W × H, according to the manufacturer's technical datasheet, p. 2. Not a scale drawing or an installation footprint.
    Length
    536 mm
    Width
    379 mm
    Height
    307 mm

    58 ± 1 kg

    Net weight per device

    Include every additional B500 when assessing the load on the floor and fixings. The manual requires a stable, load-bearing location and vertical installation; horizontal, inverted or tilted placement is not permitted.

    Plan access to the power button, status indicators, identification labels and connections. Use the mounting and securing arrangements specified for the actual configuration, not just the footprint shown in a product image.

    Check dimensions in the datasheet

    Have a qualified electrician check the existing installation, protective measures and connection requirements against the model-specific manual before commissioning.

    Shelter and ventilation

    The manual requires a shaded location protected from direct sunlight, rain and snow, with sufficient ventilation and access for maintenance. A canopy may be needed. Keep the system away from combustible, explosive or corrosive materials and out of children's reach.

    The specified installation altitude is below 2,000 m above sea level.

    Installation clearances

    The stacking instructions specify more than 23 mm between the main unit and the wall. Their accompanying text specifies at least 88 mm between the expansion batteries and the wall so the main unit can be stacked above them.

    These are arrangement-specific distances, not a complete ventilation or cable-clearance plan. Use the full manual for the selected mounting arrangement and keep the cooling surfaces and service access clear.

    Connections and earthing

    The manual requires external protective earthing and protected unused connectors. It separately identifies the earthing conductor and associated materials as items to be provided on site. Product selection alone does not verify the existing electrical installation.

    Have the electrical connection and local requirements checked before commissioning. The product page is not an installation instruction.

    Follow the model-specific manual for permitted placement, clearances, connections and electrical installation. A product image does not confirm compatibility with an existing installation.

    The manufacturer specifies paid activation of the MPPT controllers for direct PV operation. Check the current activation terms separately; activation is not included merely by selecting AC CORE here.

    Isolate before expansion

    The manual allows up to five B500 expansion batteries per main unit. Before changing the configuration, the system must be switched off and disconnected from all inputs and outputs. Switching it off alone is not sufficient when an input can restart it automatically.

    Battery expansion is not a hot-swap operation. Follow the manual's sequence and securing requirements for the heavy modules.

    These planning notes do not establish compliance for a particular site or market.

    Preparation checklist and setup steps

    Good preparation keeps system design, placement, electrical connection and software setup distinct. Use this overview to prepare the discussion with a qualified electrical professional, not as wiring instructions.

    1. Agree the system plan

      Bring the exact main-unit model, existing inverter and panel data, consumption records and desired uses. Have the electrical professional assess the connection path, protection and measurement point. Define any backup loads separately rather than assuming the whole home will be supplied.

    2. Check the proposed location

      Record the available space, access route and proposed battery arrangement. Have weight, support, securing hardware, clearances and environmental conditions checked against the manual. Photos and measurements help prepare the assessment; they do not replace it.

    3. Connect according to the manual

      Leave electrical work to the qualified professional, following the instructions for the exact model and configuration. PV, AC, expansion-battery and backup connections have different roles and limits. A product illustration or app setting cannot replace correct wiring and protection.

      AC CORE's direct PV inputs remain disabled without the separate paid upgrade. App setup is not a substitute for that activation.

    4. Set up the app and meter

      After the electrical checks, follow the manual for network and app setup. Coordinate the operating mode with the system plan. If using a compatible meter, check its measurement point, connection and displayed values with the installer; the software settings do not verify the electrical installation.

    Request installation advice

    System components

    Accessories and your selection

    Check the components for your planned system.

    OSDA 460 Wp Full Black ODA460-24V-MHDBRz

    Solar panels

    Modules supply DC energy.

    Direct connection to AC CORE requires the separate paid PV activation. Adding panels to an order does not activate its inputs.

    Details

    A module's Wp rating describes nominal solar-module power, not the storage system's AC output. Check the exact module's voltage and current, the intended wiring and the active PV inputs before choosing a quantity.

    Example of a solar-panel mounting bracket

    Panel mounts

    A mount must suit the panel frame and the actual mounting surface or railing.

    Details

    Round and square railing profiles are different selections. Check dimensions, fasteners, load-bearing capacity and the mounting instructions; a selectable bracket is not automatically approved for every panel or balcony.

    Panel mounts are not the mounting hardware used to secure the storage units.

    SunEnergyXT B500

    B500

    The expansion battery adds 5,024 Wh of nominal energy per unit.

    Details

    A main unit supports up to five B500 batteries according to the manual. Plan the total weight, stacking arrangement and securing hardware as well as the desired capacity.

    Red and black DC cable pair

    DC cables and AC connection

    A DC cable pair extends the solar connection; it is not an AC mains cable or a battery expansion connection.

    Details

    Choose the required length and verify conductor size, electrical ratings, connector compatibility and routing for the actual installation.

    The required AC connection must be assessed separately. A cable shown in a picture or listed in a generic manual does not confirm the contents of the selected merchant offer.

    EcoTracker IR

    Energy meter

    A compatible meter supplies consumption or grid measurements for demand-based control.

    Details

    The manufacturer currently lists EcoTracker IR, among other devices; support still depends on the exact meter, installation point, firmware and configuration.

    The manual lists the meter as separately available. An energy meter is not automatically a regulated German smart metering system, or iMSys, and it does not add battery capacity or output power.

    Your current selection

    The products and quantities are listed in the configurator above.

    Your selected products and quantities. For included cables and components, check each product’s delivery contents.

    What to plan separately

    • Optional products: B500, solar panels, panel mounts, DC extension leads and a compatible energy meter — only if selected.
    • Additionally required: a suitable installation location and electrical connection; any further components depend on your installation.
    • Not included by this configurator: installation services or activation of AC CORE's direct PV inputs.

    Each accessory's current product data and installation instructions remain decisive for compatibility and delivery contents.

    Sources

    Sources: manual v2.2, PDF pp. 7, 12, 16–17, 24, 28 and 35; manufacturer's energy-meter list.

    SunEnergyXT AC CORE

    Technical data and documents.

    The storage class is not the same as usable energy. See the model-specific datasheet for detailed electrical values and operating conditions.

    Manufacturer's model information
    Battery and capacity
    Model
    SunEnergyXT AC CORE
    Product type
    AC-coupled storage
    Storage class
    5 kWh
    Nominal energy per unit
    5,024 Wh
    Battery chemistry
    LiFePO4
    Nominal battery capacity
    314 Ah
    Nominal battery charging / discharging power (DC)
    2,400 / 2,600 W
    Capacity expansion
    B500
    AC charging and output
    Grid-connected AC output
    2,400 W
    Nominal AC output voltage
    230 V
    AC output frequency
    50 / 60 Hz
    Maximum AC charging apparent power
    2,400 VA
    Maximum AC charging current
    12 A
    Rated island output, separately connected loads
    2,400 W
    Transfer: UPS / non-UPS mode
    ≤ 10 ms / < 2 s
    PV connection
    Direct PV connection
    Requires separate paid MPPT activation
    Dimensions and operating conditions
    Cooling
    Natural cooling
    Enclosure protection
    IP65
    Operating temperature
    −20–55 °C; derating above 45 °C
    Maximum installation altitude
    Below 2,000 m above sea level
    Dimensions per datasheet (L × W × H)
    536 × 379 × 307 mm
    Net weight per datasheet
    58 ± 1 kg

    Source: model-specific manufacturer datasheet. DC battery ratings, AC charging, grid output and island output describe different operating paths and must not be added together. Transfer time is not a runtime guarantee or approval for whole-home backup. IP65 does not remove the installation, ventilation and weather-protection requirements.

    Connections and status indicators

    The battery stores DC energy; the inverter connects it to the AC side. Solar input, battery charging and output ratings describe different parts of this process.

    Connection functions

    Illustration of a SunEnergyXT 500-series main unit showing the connection side and cooling fins
    Series illustration from DRBO Greenenergy, not a wiring diagram. AC CORE's direct-PV inputs require separate paid activation.
    AC grid connection
    Connects the main unit to the grid-connected AC installation.
    AC island connection
    Separate output for suitable connected loads in backup operation.
    PV and battery interfaces
    Solar inputs and battery expansion interfaces are separate connections with different functions.
    Protective earth and parallel port
    Use only as described in the manual. The off-grid parallel cable is not permitted for grid-parallel operation.

    Functional description, not a wiring diagram. Port positions and connection procedures: manual v2.2, PDF pp. 13, 15, 19 and 28–33.

    What do the status lights mean?

    The main unit distinguishes PV, GRID, BACKUP, Wi-Fi, BLE, STATE and BATTERY. According to the manual, yellow at STATE indicates heating, blue indicates maintenance — state-of-charge calibration required — and red indicates a fault.

    The main-unit datasheet also lists anti-islanding protection. This is separate from backup operation and is not a feature of a standalone B500.

    Use the full indicator and flashing-pattern table before interpreting a signal. A colour alone does not diagnose the cause of a fault; follow the manual's troubleshooting and safety guidance.

    Indicator reference in manual v2.2 ↗

    Sources

    Sources: model-specific datasheet, including its cycle-life footnote; manual v2.2, PDF pp. 7, 14–19, 33 and 35–37.

    Maintenance and storage

    Plan for periods without use

    The datasheet recommends a charge/discharge cycle every three months and requires one after six months at the latest. If the system will stand unused, include this in your maintenance plan rather than treating it as maintenance-free.

    Storage is not operation

    The datasheet specifies −20 °C to +45 °C for one month of storage and 0 °C to +35 °C for long-term storage. These are storage conditions, not permission to operate or charge in any environment.

    The manual requires a clean, dry environment without condensation. Follow its handling, connection and commissioning instructions when returning the system to use.

    Sources

    Sources: model-specific datasheet, including storage and maintenance rows; manual v2.2, PDF pp. 17–19, 23–24, 28–29 and 34–35.

    Before you order

    Frequently asked questions.

    Can I combine this with BK215 or BK215 Plus?

    The manufacturer describes software coordination of 500, 500 PRO or AC CORE with BK215 / BK215 Plus through its cloud strategy or a separately configured Home Assistant installation. A direct physical cable connection between these systems is not supported. This is not a B500 battery connection. Check the exact devices, firmware and control setup before planning a combined system.

    Source: manufacturer product FAQ, checked 21 September 2026. View source ↗

    How much battery capacity do I need?

    Look at the energy you use after solar generation falls, not only your annual consumption. Compare this with the surplus available for charging. A larger battery does not create more solar energy. One main unit starts with 5,024 Wh nominal energy; B500 batteries add the same nominal energy per unit.

    Can I keep my existing solar inverter?

    AC CORE is designed for adding storage on the AC side of an existing system. The existing solar inverter can remain in use, provided the installation, metering and connection plan are suitable. Send us its exact model and your planned setup before ordering if you are unsure.

    Can I choose solar panels by total wattage alone?

    No. Open-circuit voltage, operating voltage, current and the connection arrangement must match the exact input limits. The Wp rating alone does not establish compatibility. AC CORE's direct PV inputs are not enabled in its base configuration.

    Is an energy meter included automatically?

    No. It is a separate product unless your selected item's delivery contents explicitly include it. For demand-based control, check compatibility with both the storage system and your household meter, as well as firmware and installation requirements.

    How do 500, 500 PRO and AC CORE differ?

    The 500 has 800 W grid-connected output; 500 PRO and AC CORE have 2,400 W. 500 and 500 PRO provide active direct-PV inputs. AC CORE is intended for AC-coupled storage; its direct-PV controllers require separate paid activation. Connection and installation requirements still apply.

    Does adding a B500 increase output power?

    No. B500 adds storage capacity. The main unit determines the inverter output; additional batteries do not increase that rating.

    Are all pictured accessories included?

    No. The selected products and quantities are shown in the configuration. Check each product's delivery contents for included components. Installation is not added by the configurator.

    Can I use a standard socket without checking the installation?

    Do not assume that every existing socket or circuit is suitable. Follow the exact model's installation instructions and have the electrical connection and local requirements checked before commissioning.

    Does “15 B500” mean 15 batteries on one main unit?

    No. The manufacturer's multi-main illustration distributes up to 15 expansion batteries across three main units: up to five B500 per main unit. It does not increase the limit for one tower. This is a planning illustration, not a packing list or release confirmation for a coordinated system.

    Control guides & documents

    Check the model, firmware and document version before setup. An API document does not confirm coordinated multi-unit control.

    Need technical help?

    For questions about your order, contact Wondervolt. The manufacturer also provides a technical ticket form and repair-status lookup. These links do not change your rights against the seller.